sh.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • harvard-anglia-ruskin-university
  • apa-old-doi-prefix.csl
  • sodertorns-hogskola-harvard.csl
  • sodertorns-hogskola-oxford.csl
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Förutsättningar och dysfunktioner i projekt: Ett projektledarperspektiv
Södertörn University, School of Social Sciences, Business Studies.
Södertörn University, School of Social Sciences, Business Studies.
2017 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Intresset för projekt som organiseringsform har kraftigt ökat de senaste decennierna. Trots dess popularitet misslyckas fortfarande många projekt. Tidigare forskning har lagt stort fokus på verktyg och projekt som tydligt avgränsade enheter. Bredare empirisk bas och fler teoretiska perspektiv är nödvändigt för att öka förståelsen kring projekt som fenomen. Studiens syfte är att utifrån ett projektledarperspektiv förstå förutsättningarna organisationer ger projekt, projektledare och team. Vidare ämnar studien förstå hur dysfunktioner inom team manifesteras och hur de hanteras. 

Studien är genomförd genom en kvalitativ ansats. Empiri har samlats in genom sex stycken semistrukturerade intervjuer från fem olika organisationer och branscher. Alla respondenter är projektledare med minst fem års erfarenhet av att leda ITprojekt. En genomgång av tidigare forskning och artikeldatabaser ligger till grund för den teoretiska referensramen och analysen. Teorier och begrepp som används i teoriavsnittet är Tillfällig och permanent organisering, Projektlivscykeln, Projekttriangeln och Team.

Studien visar att tydlighet i olika former som kravspecifikation, förankring, målsättningar, kommunikation och kontrakt är en förutsättning som organisationen ger projekt, projektledare och team. Utöver tydlighet är en annan förutsättning från organisationen att allokera resurser, vilket leder till problem och dysfunktioner som splittrade grupper, ökad komplexitet, urholkning av resurser, brist på kvalitet och tillit inom team som projektledare får hantera. Genom att skydda team från utomstående intressenter, skapa bra sammanhållning och forum för kommunikation, försöker projektledare ge goda förutsättningar för team att genomföra projekt.

Abstract [en]

The popularity for project as a way of organizing has dramatically increased the last decades. Despite it’s popularity a lot of projects still fail. Earlier research has focused on tools and projects as an isolated entity. More empirical data and theoretical views are necessary to increase the understanding about project as a phenomenon. The purpose of this study is to examine from the project managers point of view, what conditions project, project managers and teams get from the organization. Furthermore, the study aims to understand how dysfunctions in team manifest and how they are handled.

The study is based on a qualitative approach. Data has been gathered using sex semi-structured interviews in five different organizations and industries. All respondents are project managers with at least five years of experience managing IT-projects. A review of earlier research and databases with articles was the foundation on what the theory and analysis is based upon. Theories and concepts that’s been used are: Temporary and permanent organization, Project lifecycle, the project triangle and Team

The study shows that clarification in different forms, like project specification, goals, anchoring, communication and contracts, is a condition that the organization gives project, project managers and teams. Another condition from the organization is the allocation of resources, which creates problems and dysfunctions like fragmented groups, increased complexity, erosion of resources, lack of quality and trust within teams, and then becomes the project manager responsibility to manage. By protecting team from external stakeholders, create good cohesion and forums of communication, project managers tries to give good conditions to the team to finish the project.

Place, publisher, year, edition, pages
2017. , p. 47
Keywords [en]
project, project manager, team, conditions, dysfunctions
Keywords [sv]
projekt, projektledare, team, förutsättningar, dysfunktioner
National Category
Business Administration
Identifiers
URN: urn:nbn:se:sh:diva-33053OAI: oai:DiVA.org:sh-33053DiVA, id: diva2:1127449
Subject / course
Business Studies
Uppsok
Social and Behavioural Science, Law
Supervisors
Examiners
Available from: 2017-07-17 Created: 2017-07-14 Last updated: 2017-07-17Bibliographically approved

Open Access in DiVA

fulltext(801 kB)1154 downloads
File information
File name FULLTEXT01.pdfFile size 801 kBChecksum SHA-512
a387aed5597446effabb89d32ce68392d6df9e97ca088ec1fb9fa4d3e2a635a900c6254eca7198b6514563a77814e85cf4a1df5c8952673f2f2b720d5748f982
Type fulltextMimetype application/pdf

By organisation
Business Studies
Business Administration

Search outside of DiVA

GoogleGoogle Scholar
Total: 1155 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 678 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • harvard-anglia-ruskin-university
  • apa-old-doi-prefix.csl
  • sodertorns-hogskola-harvard.csl
  • sodertorns-hogskola-oxford.csl
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf